IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

293

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0320 # 08 Y:2007 08 2007 USE PHOTOCELL CONTROLS $324 $270 Implemented
BD0320 # 09 Y:2007 09 2007 USE SYNTHETIC LUBRICANT $1,042 $600 Not Implemented
BD0320 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $955 $600 Not Implemented
BD0320 # 11 Y:2007 11 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $642 $0 Implemented
BD0320 # 12 Y:2007 12 2007 RECOVER WASTE HEAT FROM EQUIPMENT $378 $950 Not Implemented
BD0320 # 13 Y:2007 13 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,935 $1,200 Not Implemented
BD0294 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,821 $400 Implemented
BD0294 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $1,291 $750 Not Implemented
BD0294 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $599 $263 Implemented
BD0294 # 04 Y:2005 04 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $41,600 $22,000 Implemented
BD0294 # 05 Y:2005 05 2005 EXPAND OPERATIONS INTO UNUSED SPACE $40,952 $20,000 Implemented
BD0294 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,260 $2,000 Implemented
BD0294 # 07 Y:2005 07 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $8,840 $3,000 Implemented
IC0097 # 05 Y:2005 05 2005 USE OPTIMUM TEMPERATURE $163 $1,044 Not Implemented
IC0097 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,151 $5,789 Not Implemented
IC0097 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,092 $41,838 Implemented
IC0097 # 02 Y:2005 02 2005 ISOLATE HOT OR COLD EQUIPMENT $1,426 $3,768 Not Implemented
IC0097 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $700 Implemented
IC0039 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,557 $8,250 n/a
IC0039 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,052 $165 n/a
IC0039 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,430 $1,980 n/a
IC0039 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,479 $2,000 n/a
IC0039 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,028 $35,111 n/a
IC0039 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,479 $7,150 n/a
IC0039 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,070 $4,100 n/a