Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,301
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0311 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $578 | $659 | Implemented |
UM0311 # 12 Y:2006 | 12 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $101 | $63 | Not Implemented |
UU0103 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,610 | $1,995 | Not Implemented |
UU0103 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $560 | $25 | Not Implemented |
UU0103 # 03 Y:2006 | 03 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,760 | $212 | Not Implemented |
UU0103 # 04 Y:2006 | 04 | 2006 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $47,500 | $23,700 | Not Implemented |
UU0103 # 05 Y:2006 | 05 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,510 | $5,000 | Not Implemented |
UU0103 # 06 Y:2006 | 06 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $706 | $0 | Not Implemented |
UU0103 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $50 | $115 | Not Implemented |
UU0103 # 08 Y:2006 | 08 | 2006 | INSTALL SPECTRAL REFLECTORS / DELAMP | $730 | $6,080 | Not Implemented |
LE0244 # 01 Y:2006 | 01 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19,350 | $1,000 | Implemented |
LE0244 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,690 | $1,000 | Implemented |
LE0244 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,950 | $1,024 | Implemented |
LE0244 # 04 Y:2006 | 04 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $13,305 | $42,000 | Implemented |
LE0244 # 05 Y:2006 | 05 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,705 | $50 | Not Implemented |
LE0244 # 06 Y:2006 | 06 | 2006 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,252 | $50 | Implemented |
LE0244 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $4,751 | $450 | Implemented |
LE0244 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $61,139 | $68,713 | Implemented |
BD0313 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $180,015 | $152 | Implemented |
BD0313 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,962 | $5,000 | Implemented |
BD0313 # 03 Y:2006 | 03 | 2006 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $162,249 | $310,000 | Not Implemented |
BD0313 # 04 Y:2006 | 04 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $13,938 | $0 | Implemented |
BD0313 # 05 Y:2006 | 05 | 2006 | INSTALL TURBULATORS | $2,094 | $1,500 | Implemented |
BD0313 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,516 | $0 | Not Implemented |
BD0313 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,780 | $800 | Implemented |