Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,301
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0218 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,628 | $1,500 | Implemented |
HO0218 # 03 Y:2000 | 03 | 2000 | USE OPTIMUM THICKNESS INSULATION | $4,499 | $2,640 | Implemented |
HO0218 # 04 Y:2000 | 04 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,069 | $0 | Implemented |
HO0218 # 05 Y:2000 | 05 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $3,825 | $5,000 | Not Implemented |
HO0218 # 06 Y:2000 | 06 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,400 | $20,000 | Not Implemented |
HO0218 # 07 Y:2000 | 07 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $37,179 | $0 | Implemented |
IA0237 # 01 Y:1999 | 01 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,880 | $1,142 | Not Implemented |
IA0237 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,608 | $945 | Not Implemented |
IA0237 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,447 | $264 | Not Implemented |
IA0237 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,914 | $8,729 | Not Implemented |
IA0237 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,891 | $0 | Not Implemented |
IA0237 # 06 Y:1999 | 06 | 1999 | INSTALL OCCUPANCY SENSORS | $247 | $466 | Not Implemented |
IA0237 # 07 Y:1999 | 07 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $7,704 | $10,300 | Not Implemented |
IA0237 # 08 Y:1999 | 08 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $47,034 | $3,932 | Not Implemented |
NV0139 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,567 | $600 | Implemented |
NV0139 # 02 Y:1999 | 02 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,129 | $0 | Implemented |
NV0139 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,871 | $4,148 | Implemented |
NV0139 # 04 Y:1999 | 04 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,592 | $2,832 | Not Implemented |
UD0584 # 01 Y:1999 | 01 | 1999 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $28,107 | $3,150 | Implemented |
UD0584 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $998 | $1,200 | Implemented |
UD0584 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $981 | $356 | Implemented |
OD0148 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,808 | $43,334 | Not Implemented |
OD0148 # 02 Y:1999 | 02 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,160 | $1,495 | Not Implemented |
OD0148 # 03 Y:1999 | 03 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $446 | $308 | Not Implemented |
OD0148 # 04 Y:1999 | 04 | 1999 | REDUCE VENTILATION AIR | $1,954 | $504 | Not Implemented |