IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1008 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,000 $43,000 n/a
CM1008 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $81,100 $8,000 n/a
CM1008 # 04 Y:2022 04 2022 INCREASE EFFICIENCY OF TRUCKS $25,700 $77,000 n/a
CM1008 # 05 Y:2022 05 2022 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $4,470 $0 n/a
CM1008 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,300 $440 n/a
CO0740 # 04 Y:2021 04 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,332 $0 Not Implemented
CO0740 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $6,421 $667 Implemented
CO0740 # 02 Y:2021 02 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $28,176 $298,655 Not Implemented
CO0740 # 03 Y:2021 03 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $372 $617 Not Implemented
CO0740 # 01 Y:2021 01 2021 RECOVER WASTE HEAT FROM EQUIPMENT $14,076 $28,500 Not Implemented
CO0632 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,960 $18,470 Implemented
CO0632 # 02 Y:2010 02 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,290 $21,810 Not Implemented
CO0632 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $2,030 Not Implemented
CO0632 # 04 Y:2010 04 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $1,760 $10,500 Not Implemented
CO0632 # 03 Y:2010 03 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,870 $1,220 Not Implemented
CO0625 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,200 $1,500 Not Implemented
CO0625 # 03 Y:2009 03 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,160 $30,500 Not Implemented
CO0625 # 05 Y:2009 05 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $210 Not Implemented
CO0625 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,150 $17,870 Not Implemented
CO0625 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $680 $2,020 Not Implemented
CO0541 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,090 $580 Not Implemented
CO0541 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $810 $350 Not Implemented
CO0541 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $310 Not Implemented
CO0541 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,670 $8,550 Not Implemented
CO0541 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,070 $560 Not Implemented