IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0141 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $20,786 $36,000 Not Implemented
MI0141 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,232 $200 Not Implemented
MI0141 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,036 $0 Not Implemented
MI0141 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $2,681 $160 Not Implemented
MI0141 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,825 $2,460 Not Implemented
IA0400 # 08 Y:2006 08 2006 REDUCE FLUID FLOW RATES $16,836 $1,580 Not Implemented
IA0400 # 07 Y:2006 07 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,373 $2,000 Not Implemented
IA0400 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,212 $553 Not Implemented
IA0400 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $936 $0 Not Implemented
IA0400 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,976 $16,842 Not Implemented
IA0400 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,029 $32,168 Not Implemented
IA0400 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,097 $900 Not Implemented
IA0400 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,532 $1,864 Not Implemented
LE0244 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,690 $1,000 Implemented
LE0244 # 06 Y:2006 06 2006 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,252 $50 Implemented
LE0244 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,350 $1,000 Implemented
LE0244 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,950 $1,024 Implemented
LE0244 # 04 Y:2006 04 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $13,305 $42,000 Implemented
LE0244 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,139 $68,713 Implemented
LE0244 # 05 Y:2006 05 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,705 $50 Not Implemented
LE0244 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $4,751 $450 Implemented
MA0605 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,515 $0 Implemented
MA0605 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,754 $525 Implemented
MA0605 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $17,280 $975 Implemented
MA0605 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $46,780 $18,225 Not Implemented