IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0148 # 14 Y:2019 14 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $805 $1,664 Implemented
WM0148 # 11 Y:2019 11 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,396 $0 Implemented
WM0148 # 06 Y:2019 06 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,158 $1,365 Implemented
WM0148 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,118 $5,000 Implemented
WM0101 # 07 Y:2017 07 2017 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $251 $200 Implemented
WM0085 # 04 Y:2016 04 2016 REPAIR AND ELIMINATE STEAM LEAKS $696 $180 Implemented
WI0491 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $706 $1,244 Implemented
WI0491 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,112 $1,680 Implemented
WI0491 # 03 Y:2005 03 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,911 $5,000 Implemented
WI0446 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $945 $740 Implemented
WI0446 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,093 $1,359 Implemented
WI0446 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,528 $500 Implemented
WI0446 # 01 Y:2003 01 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $20,491 $40,000 Implemented
WI0250 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $162 $0 Implemented
WI0250 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,543 $2,000 Implemented
WI0240 # 04 Y:1995 04 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,795 $400 Implemented
WI0240 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,265 $640 Implemented
WI0240 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,025 $300 Implemented
WI0231 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $17,959 $500 Implemented
WI0231 # 07 Y:1995 07 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $825 $250 Implemented