IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0255 # 08 Y:1995 08 1995 USE OPTIMUM THICKNESS INSULATION $671 $1,067 n/a
WI0255 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,156 $4,639 n/a
WI0255 # 03 Y:1995 03 1995 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $2,897 $6,500 n/a
WI0255 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $1,141 $300 n/a
WI0255 # 06 Y:1995 06 1995 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,281 $3,600 n/a
WI0255 # 04 Y:1995 04 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,521 $0 n/a
BD0028 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,733 $500 Implemented
BD0028 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $295 $350 Not Implemented
BD0028 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,517 $3,038 Not Implemented
BD0028 # 04 Y:1995 04 1995 INSTALL TURBULATORS $363 $1,220 Not Implemented
BD0028 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,081 $5,860 Not Implemented
BD0028 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $6,247 $1,150 Not Implemented
WI0206 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $771 $1,542 Implemented
WI0206 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,400 $200 Implemented
WI0206 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $812 $1,800 Not Implemented
WI0206 # 03 Y:1994 03 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $973 $2,100 Not Implemented
WI0206 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $596 $700 Implemented
WI0206 # 08 Y:1994 08 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $208 $0 Not Implemented
WI0206 # 09 Y:1994 09 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $255 $0 Not Implemented
WI0206 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $178 $225 Implemented
WI0206 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $219 $324 Implemented
WI0116 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,300 $0 Not Implemented
WI0116 # 06 Y:1991 06 1991 INSTALL TIMERS AND/OR THERMOSTATS $3,670 $1,200 Not Implemented
WI0116 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,499 $800 Not Implemented
WI0116 # 08 Y:1991 08 1991 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,510 $0 Not Implemented