IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,202

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0080 # 05 Y:1987 05 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $150 Implemented
OK0223 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,228 $2,950 Implemented
OK0223 # 02 Y:1987 02 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $471 $0 Implemented
OK0223 # 03 Y:1987 03 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $198 $123 Implemented
OK0223 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $446 $0 Implemented
GT0314 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,760 $62,400 Implemented
GT0314 # 02 Y:1987 02 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $457 $1,405 Implemented
GT0314 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $740 Implemented
GT0314 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $657 $2,125 Implemented
UD0197 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $50,748 $78,500 Implemented
UD0197 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,483 $1,804 Implemented
TS0003 # 01 Y:1984 01 1984 MINIMIZE WATER USAGE $3,197 $6 Implemented
TS0003 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,050 $1,400 Implemented
TS0003 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $541 $0 Not Implemented
TS0003 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $11,700 $25,770 Not Implemented
TS0003 # 05 Y:1984 05 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,190 $400 Implemented
TS0003 # 06 Y:1984 06 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,500 $500 Implemented
KU0131 # 01 Y:1984 01 1984 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $15,513 $17,900 Not Implemented
KU0131 # 02 Y:1984 02 1984 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,554 $18,500 Not Implemented
KU0131 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,281 $200 Implemented
KU0131 # 04 Y:1984 04 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,270 $235 Not Implemented
KU0131 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,310 $170 Implemented
KU0131 # 06 Y:1984 06 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,902 $30 Not Implemented
KU0131 # 07 Y:1984 07 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $485 $350 Implemented
KU0131 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $975 $1,000 Not Implemented