IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,202

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0567 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $65 $150 Implemented
AS0449 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,280 $31,442 Not Implemented
AS0449 # 02 Y:2018 02 2018 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,206 $1,200 Not Implemented
AS0449 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,408 $260 Not Implemented
AS0449 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $5,532 $344 Not Implemented
AS0449 # 05 Y:2018 05 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,918 $55,000 Not Implemented
AS0448 # 01 Y:2017 01 2017 HEAT WATER WITH EXHAUST HEAT $6,252 $11,340 Not Implemented
AS0448 # 02 Y:2017 02 2017 AIR CONDITION ONLY SPACE NECESSARY $3,949 $0 Implemented
AS0448 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,828 $11,700 Implemented
AS0448 # 04 Y:2017 04 2017 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $1,480 $5,950 Not Implemented
AS0448 # 05 Y:2017 05 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,478 $3,870 Not Implemented
AS0448 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $479 $56 Not Implemented
AS0443 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,407 $2,838 Implemented
AS0443 # 02 Y:2017 02 2017 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $716 $675 Not Implemented
AS0443 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $27,764 $4,325 Implemented
AS0443 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,821 $140 Implemented
CL1701 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,942 $10,000 Implemented
CL1701 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $18,050 $250 Not Implemented
CL1701 # 03 Y:2017 03 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $12,535 $3,650 Implemented
CL1701 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,647 $22,515 Implemented
CL1701 # 05 Y:2017 05 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $5,838 $13,500 Implemented
CL1701 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,382 $6,000 Not Implemented
SU0437 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $0 Not Implemented
SU0437 # 02 Y:2017 02 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $213 $62 Implemented
SU0437 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $437 $191 Not Implemented