IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,191

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0448 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $479 $56 Not Implemented
AS0443 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,407 $2,838 Implemented
AS0443 # 02 Y:2017 02 2017 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $716 $675 Not Implemented
AS0443 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $27,764 $4,325 Implemented
AS0443 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,821 $140 Implemented
CL1701 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,942 $10,000 Implemented
CL1701 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $18,050 $250 Not Implemented
CL1701 # 03 Y:2017 03 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $12,535 $3,650 Implemented
CL1701 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,647 $22,515 Implemented
CL1701 # 05 Y:2017 05 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $5,838 $13,500 Implemented
CL1701 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,382 $6,000 Not Implemented
SU0437 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $0 Not Implemented
SU0437 # 02 Y:2017 02 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $213 $62 Implemented
SU0437 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $437 $191 Not Implemented
SU0437 # 04 Y:2017 04 2017 REDUCE VENTILATION AIR $1,161 $905 Not Implemented
SU0437 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $995 $820 Not Implemented
SU0437 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,897 $5,500 Not Implemented
SU0437 # 07 Y:2017 07 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $175 $358 Not Implemented
WM0101 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,590 $22,000 Not Implemented
WM0101 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,976 $25,932 Not Implemented
WM0101 # 03 Y:2017 03 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,523 $260 Not Implemented
WM0101 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $2,778 $1,590 Not Implemented
WM0101 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,320 $6,300 Not Implemented
WM0101 # 06 Y:2017 06 2017 USE PHOTOCELL CONTROLS $545 $885 Not Implemented
WM0101 # 07 Y:2017 07 2017 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $251 $200 Implemented