Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsSIC | 2759 | Commercial Printing, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0163 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,110 | $55,940 | Implemented |
DL0163 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,160 | $7,000 | Not Implemented |
DL0163 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,570 | $200 | Not Implemented |
DL0163 # 01 Y:2016 | 01 | 2016 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $30,630 | $2,700 | Implemented |
DL0051 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $573 | $0 | Implemented |
DL0051 # 01 Y:2010 | 01 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,124 | $0 | Implemented |
DL0051 # 09 Y:2010 | 09 | 2010 | REPLACE BOILER | $6,600 | $16,743 | Implemented |
DL0051 # 07 Y:2010 | 07 | 2010 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,473 | $3,840 | Not Implemented |
DL0051 # 06 Y:2010 | 06 | 2010 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $4,250 | $960 | Not Implemented |
DL0051 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $860 | $150 | Not Implemented |
DL0051 # 04 Y:2010 | 04 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,500 | $100 | Implemented |
DL0051 # 03 Y:2010 | 03 | 2010 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $940 | $30 | Implemented |
DL0051 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,720 | $20,796 | Not Implemented |
WV0352 # 01 Y:2006 | 01 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,713 | $170 | Implemented |
WV0352 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,003 | $15,353 | Not Implemented |
WV0352 # 03 Y:2006 | 03 | 2006 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,862 | $3,440 | Implemented |
WV0352 # 04 Y:2006 | 04 | 2006 | DISCONNECT BALLASTS | $1,803 | $1,500 | Implemented |
WV0352 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,773 | $1,431 | Implemented |
WV0352 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,241 | $1,335 | Implemented |
WV0352 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $857 | $25 | Not Implemented |
WV0352 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $857 | $700 | Not Implemented |
WV0352 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $702 | $13 | Not Implemented |
WV0352 # 10 Y:2006 | 10 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $473 | $325 | Not Implemented |
WV0352 # 11 Y:2006 | 11 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $460 | $735 | Not Implemented |
WV0352 # 12 Y:2006 | 12 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $325 | $38 | Not Implemented |