Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 2759 | Commercial Printing, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0192 # 06 Y:2004 | 06 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $232 | $250 | Implemented |
SU0192 # 05 Y:2004 | 05 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $51,637 | $45,000 | Implemented |
SU0192 # 04 Y:2004 | 04 | 2004 | $217,181 | $187,500 | Implemented | |
SU0192 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,106 | $491 | Implemented |
SU0192 # 02 Y:2004 | 02 | 2004 | INSTALL OCCUPANCY SENSORS | $3,355 | $1,049 | Not Implemented |
SU0192 # 01 Y:2004 | 01 | 2004 | $65,154 | $9,000 | Implemented | |
GT0779 # 02 Y:2004 | 02 | 2004 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $590 | $2,700 | Implemented |
GT0779 # 01 Y:2004 | 01 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,183 | $5,000 | Implemented |
GT0779 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $303 | $1,000 | Implemented |
GT0779 # 06 Y:2004 | 06 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,561 | $320 | Not Implemented |
GT0779 # 05 Y:2004 | 05 | 2004 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,090 | $4,600 | Not Implemented |
GT0779 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $300 | Implemented |
GT0779 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,642 | $5,350 | Not Implemented |
UF0339 # 05 Y:2004 | 05 | 2004 | $1,651 | $5,000 | Not Implemented | |
UF0339 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $1,509 | $1,035 | Not Implemented |
UF0339 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,468 | $0 | Implemented |
UF0339 # 02 Y:2004 | 02 | 2004 | ADD AREA LIGHTING SWITCHES | $8,786 | $400 | Not Implemented |
UF0339 # 01 Y:2004 | 01 | 2004 | KEEP EQUIPMENT CLEAN | $1,555 | $432 | Implemented |
UF0339 # 06 Y:2004 | 06 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,482 | $252 | Implemented |
UF0339 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,554 | $5,600 | Implemented |
UF0339 # 11 Y:2004 | 11 | 2004 | $8,900 | $2,070 | Implemented | |
UF0339 # 08 Y:2004 | 08 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,159 | $5,189 | Implemented |
UF0339 # 09 Y:2004 | 09 | 2004 | COMBINE UTILITY METERS | $1,189 | $0 | Implemented |
UF0339 # 10 Y:2004 | 10 | 2004 | METER WASTE WATER | $1,036 | $940 | Not Implemented |
TA0069 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,482 | $0 | Implemented |