Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 2761 | Manifold Business Forms |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0255 # 08 Y:2018 | 08 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $938 | $225 | Implemented |
MZ0255 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $1,086 | $280 | Implemented |
MZ0255 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,260 | $100 | Not Implemented |
MZ0255 # 05 Y:2018 | 05 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,457 | $3,200 | Not Implemented |
MZ0255 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,910 | $1,540 | Implemented |
MZ0255 # 03 Y:2018 | 03 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,288 | $1,000 | Implemented |
MZ0255 # 02 Y:2018 | 02 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,908 | $25,000 | Not Implemented |
MZ0255 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $47,570 | $16,500 | Implemented |
KU0243 # 04 Y:1988 | 04 | 1988 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $8,090 | $4,000 | Not Implemented |
KU0243 # 06 Y:1988 | 06 | 1988 | IMPROVE LUBRICATION PRACTICES | $2,035 | $0 | Implemented |
KU0243 # 11 Y:1988 | 11 | 1988 | USE COMPRESSOR AIR FILTERS | $128 | $0 | Implemented |
KU0243 # 10 Y:1988 | 10 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $454 | $0 | Not Implemented |
KU0243 # 09 Y:1988 | 09 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $534 | $450 | Implemented |
KU0243 # 08 Y:1988 | 08 | 1988 | MINIMIZE WATER USAGE | $1,298 | $1,320 | Not Implemented |
KU0243 # 05 Y:1988 | 05 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $2,035 | $200 | Implemented |
KU0243 # 07 Y:1988 | 07 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,798 | $1,320 | Implemented |
KU0243 # 03 Y:1988 | 03 | 1988 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,418 | $4,800 | Implemented |
KU0243 # 02 Y:1988 | 02 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,137 | $20,300 | Not Implemented |
KU0243 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,552 | $9,509 | Not Implemented |
KU0164 # 09 Y:1985 | 09 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $153 | $0 | Implemented |
KU0164 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,475 | $500 | Implemented |
KU0164 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $287 | $100 | Not Implemented |
KU0164 # 05 Y:1985 | 05 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,269 | $3,069 | Not Implemented |
KU0164 # 08 Y:1985 | 08 | 1985 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $6,610 | $3,000 | Implemented |
KU0164 # 02 Y:1985 | 02 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,280 | $4,700 | Not Implemented |