IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,673

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0188 # 03 Y:2001 03 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,400 $2,800 Not Implemented
UM0188 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $263 $1,020 Not Implemented
UM0188 # 05 Y:2001 05 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $3,333 $1,500 Implemented
OK0617 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $335 $304 Implemented
OK0617 # 02 Y:2001 02 2001 INSTALL SET-BACK TIMERS $323 $439 Implemented
OK0617 # 03 Y:2001 03 2001 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $17,946 $30,145 Not Implemented
OK0617 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $409 $354 Not Implemented
OK0617 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,337 $9,259 Not Implemented
OK0617 # 06 Y:2001 06 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $1,170 $1,000 Not Implemented
OK0617 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $23,985 $27,632 Not Implemented
OK0613 # 01 Y:2001 01 2001 INSTALL SET-BACK TIMERS $10,756 $1,026 Not Implemented
OK0613 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,071 $4,000 Implemented
OK0613 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $456 $2,600 Implemented
OK0613 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,475 $7,120 Not Implemented
OK0613 # 05 Y:2001 05 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,508 $6,000 Not Implemented
OK0613 # 06 Y:2001 06 2001 RECOVER AND REUSE WASTE MATERIAL $54,883 $20,680 Not Implemented
OK0613 # 07 Y:2001 07 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,400 $572 Not Implemented
OK0613 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $304 $125 Not Implemented
UF0241 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,848 $2,526 Implemented
UF0241 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,327 $91,728 Implemented
UF0241 # 03 Y:2000 03 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $122,360 $141,700 Not Implemented
UF0241 # 04 Y:2000 04 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,652 $0 Implemented
UF0241 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $1,863 $3,058 Implemented
UF0241 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,741,926 $6,200,000 Not Implemented
UF0241 # 07 Y:2000 07 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,880 $9,000 Implemented