IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2216 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,044 $18,502 Implemented
LS2216 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $1,095 $350 Implemented
LS2216 # 03 Y:2022 03 2022 USE PHOTOCELL CONTROLS $251 $74 Implemented
LS2207 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,650 $158,575 Implemented
LS2207 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,432 $32,496 Implemented
LS2207 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,876 $30,073 Implemented
LS1905 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,646 $10,000 Implemented
LS1905 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $1,865 $3,000 Implemented
LS1905 # 02 Y:2019 02 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,408 $0 Implemented
LS1905 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,092 $50 Implemented
LL0252 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $886 $525 Implemented
LL0252 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $76 $79 Implemented
LL0252 # 04 Y:2006 04 2006 TURN OFF STEAM TRACING DURING MILD WEATHER $1,157 $170 Implemented
LL0252 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,878 $4,680 Implemented
LL0252 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $91,633 $1,740 Implemented
LL0158 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,000 $420 Implemented
LL0158 # 05 Y:2003 05 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $116 $226 Implemented
LL0158 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $1,303 $164 Implemented
LL0158 # 03 Y:2003 03 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $16,068 $5,800 Implemented
LL0158 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,145 $11,600 Implemented
AR0014 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,666 $871 Implemented
AR0014 # 03 Y:1993 03 1993 USE POWER DURING OFF-PEAK PERIODS $5,562 $3,300 Implemented
AR0014 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,046 $10,310 Implemented