IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0447 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $1,800 Not Implemented
UD0447 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,451 $8,620 Implemented
UD0447 # 04 Y:1994 04 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,082 $0 Implemented
UD0447 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,206 $1,000 Implemented
UD0447 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,160 $5,000 Not Implemented
UD0447 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $1,018 $1,500 Implemented
MO0118 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,422 $273 Not Implemented
MO0118 # 08 Y:1994 08 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,294 $300 Not Implemented
MO0118 # 07 Y:1994 07 1994 USE SYNTHETIC LUBRICANT $869 $336 Implemented
MO0118 # 06 Y:1994 06 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,742 $50 Not Implemented
MO0118 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $940 $520 Not Implemented
MO0118 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,982 $10,074 Not Implemented
MO0118 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,307 $671 Not Implemented
MO0118 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,502 $17,225 Not Implemented
TN0519 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,588 $1,170 Not Implemented
TN0519 # 03 Y:1994 03 1994 USE SYNTHETIC LUBRICANT $2,004 $0 Not Implemented
TN0519 # 02 Y:1994 02 1994 INSTALL TIMERS AND/OR THERMOSTATS $2,780 $2,100 Not Implemented
TN0519 # 01 Y:1994 01 1994 USE MINIMUM STEAM OPERATING PRESSURE $12,830 $0 Not Implemented
SD0081 # 04 Y:1994 04 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $528 $95 Not Implemented
SD0081 # 10 Y:1994 10 1994 INSTALL OCCUPANCY SENSORS $1,343 $3,680 Not Implemented
SD0081 # 09 Y:1994 09 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $1,313 $2,705 Not Implemented
SD0081 # 08 Y:1994 08 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $599 $60 Not Implemented
SD0081 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,089 $13,406 Not Implemented
SD0081 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,357 $11,600 Not Implemented
SD0081 # 05 Y:1994 05 1994 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $14,721 $800 Not Implemented