Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
27
matching recommendationsSIC | 284 | Soap, Cleaners, And Toilet Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0479 # 07 Y:2020 | 07 | 2020 | INSTALL OCCUPANCY SENSORS | $1,596 | $4,600 | Not Implemented |
AS0479 # 06 Y:2020 | 06 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,794 | $7,400 | Implemented |
AS0479 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,834 | $330 | Implemented |
AS0479 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,979 | $1,639 | Implemented |
AS0479 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,108 | $6,016 | Implemented |
AS0479 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,892 | $111,826 | Not Implemented |
AS0479 # 01 Y:2020 | 01 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,215 | $200 | Implemented |
AS0479 # 08 Y:2020 | 08 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $60 | $281 | Not Implemented |
AS0475 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,779 | $895 | Implemented |
AS0475 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $110 | $23 | Not Implemented |
AS0475 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $159 | $752 | Implemented |
AS0475 # 06 Y:2019 | 06 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $411 | $236 | Not Implemented |
AS0475 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,084 | $1,166 | Not Implemented |
AS0475 # 04 Y:2019 | 04 | 2019 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $2,515 | $7,906 | Not Implemented |
AS0475 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,094 | $5,938 | Implemented |
AS0475 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,577 | $20,083 | Not Implemented |
AS0021 # 01 Y:1991 | 01 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,378 | $0 | Implemented |
AS0021 # 10 Y:1991 | 10 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,246 | $18,000 | Implemented |
AS0021 # 09 Y:1991 | 09 | 1991 | IMPROVE LUBRICATION PRACTICES | $7,796 | $0 | Implemented |
AS0021 # 08 Y:1991 | 08 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,180 | $1,760 | Implemented |
AS0021 # 07 Y:1991 | 07 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,885 | $1,000 | Implemented |
AS0021 # 06 Y:1991 | 06 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $17,386 | $18,000 | Implemented |
AS0021 # 05 Y:1991 | 05 | 1991 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $90,586 | $400,000 | Implemented |
AS0021 # 04 Y:1991 | 04 | 1991 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,913 | $35,000 | Implemented |
AS0021 # 03 Y:1991 | 03 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,879 | $0 | Implemented |