Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,597
matching recommendationsSIC | 289 | Miscellaneous Chemical Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0678 # 18 Y:2025 | 18 | 2025 | INSULATE BARE EQUIPMENT | $664 | $914 | n/a |
WV0678 # 10 Y:2025 | 10 | 2025 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,453 | $20,950 | n/a |
WV0678 # 13 Y:2025 | 13 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,130 | $2,676 | n/a |
WV0678 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,003 | $3,121 | n/a |
WV0678 # 01 Y:2025 | 01 | 2025 | MINIMIZE WATER USAGE | $16,085 | $31,231 | n/a |
WV0678 # 11 Y:2025 | 11 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,279 | $18,380 | n/a |
WV0678 # 05 Y:2025 | 05 | 2025 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $11,667 | $55,000 | n/a |
WV0678 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,707 | $41,750 | n/a |
WV0678 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,842 | $11,112 | n/a |
WV0678 # 14 Y:2025 | 14 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,031 | $684 | n/a |
WV0678 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $4,772 | $4,323 | n/a |
WV0678 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,185 | $11,425 | n/a |
WV0678 # 04 Y:2025 | 04 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,735 | $5,200 | n/a |
WV0678 # 12 Y:2025 | 12 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $4,059 | $1,304 | n/a |
WV0678 # 15 Y:2025 | 15 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,433 | $11,061 | n/a |
WV0678 # 16 Y:2025 | 16 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,980 | $304 | n/a |
WV0678 # 19 Y:2025 | 19 | 2025 | REDUCE VENTILATION AIR | $631 | $2,400 | n/a |
WV0678 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $22,738 | $38,304 | n/a |
WV0678 # 17 Y:2025 | 17 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,209 | $3,002 | n/a |
DL0255 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,300 | $800 | n/a |
DL0255 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,077 | $15,000 | n/a |
DL0255 # 07 Y:2025 | 07 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,100 | $25,000 | n/a |
DL0255 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,638 | $17,000 | n/a |
DL0255 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $246,492 | $36,000 | n/a |
DL0255 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,190 | $5,500 | n/a |