Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,597
matching recommendationsSIC | 289 | Miscellaneous Chemical Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0678 # 01 Y:2025 | 01 | 2025 | MINIMIZE WATER USAGE | $16,085 | $31,231 | n/a |
WV0678 # 11 Y:2025 | 11 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,279 | $18,380 | n/a |
WV0678 # 18 Y:2025 | 18 | 2025 | INSULATE BARE EQUIPMENT | $664 | $914 | n/a |
WV0678 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,185 | $11,425 | n/a |
WV0678 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $4,772 | $4,323 | n/a |
WV0678 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,707 | $41,750 | n/a |
WV0678 # 10 Y:2025 | 10 | 2025 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,453 | $20,950 | n/a |
WV0678 # 05 Y:2025 | 05 | 2025 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $11,667 | $55,000 | n/a |
WV0678 # 15 Y:2025 | 15 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,433 | $11,061 | n/a |
WV0678 # 19 Y:2025 | 19 | 2025 | REDUCE VENTILATION AIR | $631 | $2,400 | n/a |
WV0678 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $22,738 | $38,304 | n/a |
WV0678 # 14 Y:2025 | 14 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,031 | $684 | n/a |
WV0678 # 17 Y:2025 | 17 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,209 | $3,002 | n/a |
WV0678 # 04 Y:2025 | 04 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,735 | $5,200 | n/a |
WV0678 # 12 Y:2025 | 12 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $4,059 | $1,304 | n/a |
WV0678 # 16 Y:2025 | 16 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,980 | $304 | n/a |
WV0678 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,842 | $11,112 | n/a |
WV0678 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,003 | $3,121 | n/a |
WV0678 # 13 Y:2025 | 13 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,130 | $2,676 | n/a |
DL0255 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $246,492 | $36,000 | n/a |
DL0255 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,300 | $800 | n/a |
DL0255 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,190 | $5,500 | n/a |
DL0255 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $3,259 | $5,600 | n/a |
DL0255 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,077 | $15,000 | n/a |
DL0255 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,638 | $17,000 | n/a |