Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
300
matching recommendationsSIC | 2891 | Adhesives And Sealants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0092 # 01 Y:1990 | 01 | 1990 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,150 | $800 | Implemented |
WI0092 # 02 Y:1990 | 02 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,481 | $500 | Implemented |
WI0092 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $126 | $1,929 | Implemented |
WI0092 # 06 Y:1990 | 06 | 1990 | INSTALL / REPAIR INSULATION ON STEAM LINES | $249 | $53 | Implemented |
WI0092 # 07 Y:1990 | 07 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $882 | $0 | Implemented |
GT0389 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $710 | $0 | Implemented |
GT0389 # 02 Y:1989 | 02 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,021 | $895 | Implemented |
GT0389 # 07 Y:1989 | 07 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $170 | $262 | Implemented |
GT0389 # 08 Y:1989 | 08 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $119 | $0 | Implemented |
RU0031 # 02 Y:1988 | 02 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,200 | $478 | Implemented |
RU0031 # 03 Y:1988 | 03 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,963 | $13,100 | Implemented |
RU0031 # 04 Y:1988 | 04 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,646 | $500 | Implemented |
AM0038 # 02 Y:1988 | 02 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $372 | $500 | Implemented |
AM0038 # 03 Y:1988 | 03 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $309 | $0 | Implemented |
AM0038 # 04 Y:1988 | 04 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $276 | $250 | Implemented |
AM0038 # 06 Y:1988 | 06 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $123 | $225 | Implemented |
AM0038 # 07 Y:1988 | 07 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $76 | $200 | Implemented |
UD0230 # 01 Y:1987 | 01 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,303 | $1,200 | Implemented |
UD0230 # 02 Y:1987 | 02 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,952 | $50,000 | Implemented |
UD0230 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $607 | $12,500 | Implemented |
KU0186 # 03 Y:1986 | 03 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $4,780 | $800 | Implemented |
KU0186 # 04 Y:1986 | 04 | 1986 | INSULATE BARE EQUIPMENT | $1,657 | $1,500 | Implemented |
KU0186 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $896 | $725 | Implemented |
KU0186 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $360 | $0 | Implemented |
KU0186 # 07 Y:1986 | 07 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $406 | $0 | Implemented |