IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

300

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0092 # 01 Y:1990 01 1990 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,150 $800 Implemented
WI0092 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,481 $500 Implemented
WI0092 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $1,929 Implemented
WI0092 # 06 Y:1990 06 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $249 $53 Implemented
WI0092 # 07 Y:1990 07 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $882 $0 Implemented
GT0389 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $710 $0 Implemented
GT0389 # 02 Y:1989 02 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $1,021 $895 Implemented
GT0389 # 07 Y:1989 07 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $170 $262 Implemented
GT0389 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $119 $0 Implemented
RU0031 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,200 $478 Implemented
RU0031 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,963 $13,100 Implemented
RU0031 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,646 $500 Implemented
AM0038 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $372 $500 Implemented
AM0038 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $309 $0 Implemented
AM0038 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $276 $250 Implemented
AM0038 # 06 Y:1988 06 1988 INSTALL TIMERS AND/OR THERMOSTATS $123 $225 Implemented
AM0038 # 07 Y:1988 07 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $76 $200 Implemented
UD0230 # 01 Y:1987 01 1987 RECOVER WASTE HEAT FROM EQUIPMENT $1,303 $1,200 Implemented
UD0230 # 02 Y:1987 02 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,952 $50,000 Implemented
UD0230 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $607 $12,500 Implemented
KU0186 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $4,780 $800 Implemented
KU0186 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $1,657 $1,500 Implemented
KU0186 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $896 $725 Implemented
KU0186 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $360 $0 Implemented
KU0186 # 07 Y:1986 07 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $406 $0 Implemented