IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0529 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $118,441 $791,800 Implemented
LE0529 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,316 $89,649 Implemented
LE0529 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,841 $6,763 Implemented
LE0409 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $591 $0 Implemented
LE0409 # 02 Y:2016 02 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,416 $2,000 Implemented
LE0409 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,598 $5,700 Implemented
LE0409 # 05 Y:2016 05 2016 USE RADIANT HEATER FOR SPOT HEATING $6,148 $21,000 Implemented
DL0089 # 02 Y:2012 02 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $7,675 $27,000 Implemented
DL0089 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $620 $81 Implemented
DL0089 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,880 $0 Implemented
DL0089 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,050 $6,800 Implemented
RU0130 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,286 $303 Implemented
RU0130 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,789 $0 Implemented
RU0130 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,167 $0 Implemented
RU0130 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,608 $257 Implemented
RU0130 # 05 Y:1991 05 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,632 $16,500 Implemented
RU0130 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,003 $500 Implemented
RU0031 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,200 $478 Implemented
RU0031 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,963 $13,100 Implemented
RU0031 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,646 $500 Implemented