IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0537 # 13 Y:2023 13 2023 INSTALL OCCUPANCY SENSORS $104 $514 Not Implemented
SU0537 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,479 $0 Not Implemented
SU0537 # 02 Y:2023 02 2023 DISCONNECT BALLASTS $140 $0 Not Implemented
SU0537 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $939 $0 Not Implemented
SU0537 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,744 $0 Not Implemented
SU0537 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $38,869 $390 Not Implemented
SU0537 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,763 $500 Not Implemented
SU0537 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,091 $140 Not Implemented
SU0537 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,448 $742 Not Implemented
SU0537 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,268 $521 Not Implemented
SU0537 # 10 Y:2023 10 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $683 $526 Not Implemented
SU0537 # 11 Y:2023 11 2023 REDUCE VENTILATION AIR $2,120 $2,030 Not Implemented
SU0537 # 12 Y:2023 12 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $420 $974 Not Implemented
LE0529 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $727 $0 Not Implemented
LE0529 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,841 $6,763 Implemented
LE0529 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,316 $89,649 Implemented
LE0529 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $118,441 $791,800 Implemented
LE0409 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $45,635 $252,000 Not Implemented
LE0409 # 05 Y:2016 05 2016 USE RADIANT HEATER FOR SPOT HEATING $6,148 $21,000 Implemented
LE0409 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,605 $43,760 Not Implemented
LE0409 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,598 $5,700 Implemented
LE0409 # 02 Y:2016 02 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,416 $2,000 Implemented
LE0409 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $591 $0 Implemented
DL0089 # 02 Y:2012 02 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $7,675 $27,000 Implemented
DL0089 # 05 Y:2012 05 2012 USE OPTIMUM THICKNESS INSULATION $1,025 $2,275 Not Implemented