IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 2892 Explosives
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0630 # 02 Y:2013 02 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,290 $1,600 Implemented
AM0630 # 01 Y:2013 01 2013 USE EVAPORATION TO CONCENTRATE MATERIAL $27,000 $5,000 Implemented
AM0630 # 11 Y:2013 11 2013 REUSE RAGS UNTIL COMPLETELY SOILED $480 $0 Implemented
AM0630 # 10 Y:2013 10 2013 USE SYNTHETIC LUBRICANT $480 $0 Not Implemented
AM0630 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,175 $0 Not Implemented
AM0630 # 08 Y:2013 08 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,500 $0 Not Implemented
AM0630 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,240 $350 Implemented
AM0630 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,270 $0 Implemented
AM0630 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,300 $1,040 Implemented
AM0630 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $97,740 $5,000 Implemented
AM0630 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,450 $27,300 Implemented
TT0080 # 06 Y:2011 06 2011 INSTALL TIMERS AND/OR THERMOSTATS $3,475 $400 Not Implemented
TT0080 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,663 $10,287 Not Implemented
TT0080 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,064 $4,400 Not Implemented
TT0080 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $546 $977 Not Implemented
TT0080 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,837 $7,143 Not Implemented
TT0080 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,663 $100 Implemented
KG0072 # 07 Y:1996 07 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $955 $0 Not Implemented
KG0072 # 08 Y:1996 08 1996 REDUCE SCRAP PRODUCTION $21,888 $2,000 Not Implemented
KG0072 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $966 $150 Not Implemented
KG0072 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,255 $1,900 Not Implemented
KG0072 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $25 Implemented
KG0072 # 03 Y:1996 03 1996 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,396 $1,500 Implemented
KG0072 # 02 Y:1996 02 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,206 $0 Implemented
KG0072 # 01 Y:1996 01 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,148 $0 Not Implemented