IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0371 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,119 $317 Not Implemented
LE0371 # 08 Y:2014 08 2014 REPAIR OR REPLACE STEAM TRAPS $963 $400 Not Implemented
LE0371 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,667 $28 Implemented
LE0371 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $645 $0 Not Implemented
LE0371 # 02 Y:2014 02 2014 INSTALL TIMERS AND/OR THERMOSTATS $3,996 $0 Not Implemented
LE0371 # 01 Y:2014 01 2014 ADJUST BURNERS FOR EFFICIENT OPERATION $15,710 $0 Not Implemented
WV0403 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,238 $110 Implemented
WV0403 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,274 $1,620 Implemented
WV0403 # 08 Y:2010 08 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,342 $10,700 Not Implemented
WV0403 # 07 Y:2010 07 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,357 $8,600 Not Implemented
WV0403 # 06 Y:2010 06 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,610 $8,756 Not Implemented
WV0403 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $4,543 $20,500 Not Implemented
WV0403 # 04 Y:2010 04 2010 IMPROVE LUBRICATION PRACTICES $9,486 $5,823 Not Implemented
WV0403 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,231 $70,410 Implemented
WV0403 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,050 $52,453 Implemented
WV0403 # 01 Y:2010 01 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $45,685 $55,000 Implemented
WV0403 # 11 Y:2010 11 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,180 $748 Implemented
WV0346 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,230 $1,143 Implemented
WV0346 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,998 $13,688 Implemented
WV0346 # 03 Y:2006 03 2006 USE RADIANT HEATER FOR SPOT HEATING $4,996 $8,800 Not Implemented
WV0346 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,442 $4,540 Not Implemented
WV0346 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,952 $656 Not Implemented
WV0346 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $1,502 $737 Implemented
WV0346 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $850 $230 Implemented
WV0346 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $800 $14 Implemented