IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0669 # 01 Y:2013 01 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,590 $15,280 Implemented
CO0669 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $4,190 $4,840 Not Implemented
CO0669 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $390 Implemented
OK0855 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,499 $9,900 Not Implemented
OK0855 # 02 Y:2013 02 2013 INSTALL SET-BACK TIMERS $4,654 $1,287 Implemented
OK0855 # 03 Y:2013 03 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,588 $9,900 Not Implemented
OK0855 # 04 Y:2013 04 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $8,807 $2,070 Implemented
OK0855 # 05 Y:2013 05 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,342 $18,900 Not Implemented
OK0855 # 06 Y:2013 06 2013 USE RADIANT HEATER FOR SPOT HEATING $3,427 $15,550 Implemented
OK0855 # 07 Y:2013 07 2013 INSTALL SET-BACK TIMERS $386 $1,600 Not Implemented
OK0855 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,693 $20,825 Implemented
OK0855 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,095 $69,580 Implemented
OK0855 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,628 $22,407 Implemented
OK0855 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,455 $8,640 Not Implemented
OK0855 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,606 $3,000 Implemented
OK0855 # 13 Y:2013 13 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,337 $2,676 Not Implemented
OK0855 # 14 Y:2013 14 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,571 $3,850 Not Implemented
OK0855 # 15 Y:2013 15 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,950 $1,220 Not Implemented
OK0855 # 16 Y:2013 16 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,059 $54,000 Not Implemented
OK0855 # 17 Y:2013 17 2013 INSULATE BARE EQUIPMENT $7,673 $1,199 Not Implemented
OK0855 # 18 Y:2013 18 2013 INSULATE BARE EQUIPMENT $258 $960 Not Implemented
OK0855 # 19 Y:2013 19 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,292 $6,796 Not Implemented
OK0855 # 20 Y:2013 20 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,823 $3,063 Not Implemented
OK0855 # 21 Y:2013 21 2013 OPTIMIZE PLANT POWER FACTOR $17,798 $13,508 Implemented
TT0113 # 01 Y:2013 01 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $12,194 $0 Not Implemented