Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,163
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KG0063 # 11 Y:1996 | 11 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $557,549 | $5,000 | Not Implemented |
AM0277 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $351,900 | $70,000 | Not Implemented |
AM0277 # 02 Y:1996 | 02 | 1996 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $34,050 | $30,000 | Implemented |
AM0277 # 03 Y:1996 | 03 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $28,650 | $180 | Implemented |
AM0277 # 04 Y:1996 | 04 | 1996 | OPTIMIZE PLANT POWER FACTOR | $22,800 | $25,000 | Not Implemented |
AM0277 # 05 Y:1996 | 05 | 1996 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,300 | $0 | Not Implemented |
AM0277 # 06 Y:1996 | 06 | 1996 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,420 | $4,410 | Implemented |
AM0277 # 07 Y:1996 | 07 | 1996 | METER WASTE WATER | $1,600 | $2,500 | Implemented |
AM0277 # 08 Y:1996 | 08 | 1996 | INSULATE BARE EQUIPMENT | $1,250 | $50 | Not Implemented |
AM0277 # 09 Y:1996 | 09 | 1996 | INSULATE BARE EQUIPMENT | $880 | $50 | Not Implemented |
AM0277 # 10 Y:1996 | 10 | 1996 | INSULATE BARE EQUIPMENT | $860 | $860 | Not Implemented |
AM0277 # 11 Y:1996 | 11 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $530 | $120 | Implemented |
KG0057 # 01 Y:1996 | 01 | 1996 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $10,875 | $4,069 | Not Implemented |
KG0057 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,958 | $17,130 | Implemented |
KG0057 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,160 | $4,878 | Implemented |
KG0057 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,289 | $5,200 | Implemented |
KG0057 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,408 | $375 | Implemented |
KG0057 # 06 Y:1996 | 06 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $957 | $170 | Implemented |
KG0057 # 07 Y:1996 | 07 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $829 | $650 | Implemented |
KG0057 # 08 Y:1996 | 08 | 1996 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $2,148 | $0 | Implemented |
KG0057 # 09 Y:1996 | 09 | 1996 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $16,059 | $2,850 | Not Implemented |
KG0057 # 10 Y:1996 | 10 | 1996 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,200 | $0 | Implemented |
KG0057 # 11 Y:1996 | 11 | 1996 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $816 | $300 | Not Implemented |
AM0273 # 01 Y:1996 | 01 | 1996 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $167,000 | $73,600 | Implemented |
AM0273 # 02 Y:1996 | 02 | 1996 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $7,330 | $400 | Implemented |