IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0205 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,085 $3,659 Implemented
OR0205 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,724 $6,475 Implemented
OR0205 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $1,026 $1,400 Not Implemented
OR0205 # 05 Y:1994 05 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $4,373 $14,067 Not Implemented
OR0205 # 06 Y:1994 06 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $845 $0 Implemented
OR0205 # 07 Y:1994 07 1994 REDUCE SCRAP PRODUCTION $7,200 $16,420 Implemented
IA0081 # 01 Y:1994 01 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,823 $7,982 Implemented
IA0081 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,535 $6,200 Implemented
IA0081 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,455 $2,215 Implemented
IA0081 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,938 $2,400 Not Implemented
IA0081 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $289 $462 Not Implemented
IA0081 # 06 Y:1994 06 1994 DISCONNECT BALLASTS $201 $494 Implemented
IA0081 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $311 $25 Implemented
IA0081 # 08 Y:1994 08 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $294 $786 Implemented
AR0019 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,832 $450 Implemented
AR0019 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,270 $1,996 Implemented
AR0019 # 03 Y:1994 03 1994 REPAIR AND ELIMINATE STEAM LEAKS $8,858 $2,200 Implemented
AR0019 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,987 $1,177 Implemented
AR0019 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,704 $0 Not Implemented
AR0019 # 06 Y:1994 06 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,243 $47,000 Not Implemented
SD0078 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,072 $2,240 Implemented
SD0078 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,864 $100 Implemented
SD0078 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,891 $832 Not Implemented
SD0078 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $152 $153 Not Implemented
SD0078 # 05 Y:1994 05 1994 INSTALL TIMERS AND/OR THERMOSTATS $1,549 $300 Not Implemented