IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0245 # 02 Y:1992 02 1992 REDESIGN PROCESS $4,412 $1,554 Implemented
MA0245 # 03 Y:1992 03 1992 RECOVER AND REUSE COOLING WATER $2,833 $5,040 Implemented
MA0245 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,237 $0 Implemented
MA0246 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,746 $3,614 Not Implemented
MA0246 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $1,358 $2,672 Implemented
MA0246 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,645 $1,995 Not Implemented
MA0246 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $526 $0 Implemented
MA0246 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $443 $386 Implemented
MA0246 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $100 $85 Implemented
OK0384 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,774 $0 Implemented
OK0384 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,854 $574 Not Implemented
OK0384 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $148,079 $77,986 Not Implemented
OK0384 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $4,046 $7,844 Not Implemented
OK0384 # 05 Y:1992 05 1992 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $3,416 $9,000 Not Implemented
OK0384 # 06 Y:1992 06 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $11,847 $16,034 Implemented
UD0372 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,610 $0 Implemented
UD0372 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,103 $841 Not Implemented
UD0372 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $305 $6,008 Implemented
WI0149 # 01 Y:1992 01 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,441 $0 Not Implemented
WI0149 # 02 Y:1992 02 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,795 $5,000 Not Implemented
WI0149 # 03 Y:1992 03 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,128 $30,000 Implemented
WI0149 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,770 $7 Implemented
WI0149 # 05 Y:1992 05 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,137 $4,550 Not Implemented
WI0149 # 06 Y:1992 06 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,140 $250 Implemented
WI0149 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,314 $800 Not Implemented