Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,765
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0345 # 04 Y:1991 | 04 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $1,540 | $720 | Not Implemented |
UD0338 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,351 | $0 | Not Implemented |
UD0338 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,344 | $0 | Not Implemented |
UD0338 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $1,748 | $0 | Not Implemented |
UD0334 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,567 | $0 | Implemented |
UD0334 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,627 | $4,000 | Implemented |
UD0334 # 03 Y:1991 | 03 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $5,208 | $0 | Implemented |
UD0329 # 01 Y:1990 | 01 | 1990 | OPTIMIZE PLANT POWER FACTOR | $17,856 | $20,000 | Implemented |
UD0329 # 02 Y:1990 | 02 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,309 | $1,000 | Implemented |
UD0329 # 03 Y:1990 | 03 | 1990 | BURN WASTE OIL FOR HEAT | $6,067 | $0 | Implemented |
UD0329 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,783 | $7,500 | Implemented |
UD0329 # 05 Y:1990 | 05 | 1990 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,223 | $6,240 | Implemented |
UD0319 # 01 Y:1990 | 01 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,147 | $0 | Implemented |
UD0319 # 02 Y:1990 | 02 | 1990 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,320 | $0 | Implemented |
UD0319 # 03 Y:1990 | 03 | 1990 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $13,053 | $0 | Implemented |
UD0319 # 04 Y:1990 | 04 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,790 | $0 | Implemented |
UD0316 # 01 Y:1990 | 01 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,000 | $0 | Not Implemented |
UD0316 # 02 Y:1990 | 02 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,890 | $0 | Not Implemented |
UD0316 # 03 Y:1990 | 03 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,175 | $0 | Not Implemented |
UD0316 # 04 Y:1990 | 04 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,611 | $0 | Not Implemented |
UD0316 # 05 Y:1990 | 05 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,186 | $10,000 | Not Implemented |
UD0282 # 01 Y:1989 | 01 | 1989 | OPTIMIZE PLANT POWER FACTOR | $9,760 | $10,000 | Not Implemented |
UD0282 # 02 Y:1989 | 02 | 1989 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,009 | $500 | Not Implemented |
UD0282 # 03 Y:1989 | 03 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,389 | $0 | Not Implemented |
UD0282 # 04 Y:1989 | 04 | 1989 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $950 | $1,500 | Not Implemented |