IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

431

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0374 # 03 Y:1996 03 1996 USE MAGNETIC TECHNOLOGY TO TREAT WATER $1,575 $11,399 Not Implemented
MA0374 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $352 $130 Not Implemented
MA0354 # 01 Y:1996 01 1996 USE RADIANT HEATER FOR SPOT HEATING $23,668 $72,000 Implemented
MA0354 # 02 Y:1996 02 1996 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $2,604 $5,000 Not Implemented
MA0354 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $2,340 $4,335 Not Implemented
MA0354 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $613 $200 Implemented
MA0354 # 05 Y:1996 05 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $495 $0 Not Implemented
MA0354 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $472 $770 Not Implemented
MA0354 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $312 Not Implemented
MA0342 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $10,527 $8,100 Implemented
MA0342 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,510 $0 Not Implemented
MA0342 # 03 Y:1995 03 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $5,090 $25,000 Not Implemented
MA0342 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,836 $0 Implemented
MA0342 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $3,525 $3,443 Implemented
MA0342 # 06 Y:1995 06 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,705 $7,770 Not Implemented
MA0342 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,776 $725 Not Implemented
MA0342 # 08 Y:1995 08 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $797 $0 Implemented
MA0342 # 09 Y:1995 09 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $547 $1,500 Not Implemented
MA0342 # 10 Y:1995 10 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $326 $711 Not Implemented
MA0328 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,528 $44,433 Implemented
MA0328 # 02 Y:1995 02 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,793 $9,350 Not Implemented
MA0328 # 03 Y:1995 03 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,972 $3,068 Not Implemented
MA0328 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,889 $540 Implemented
MA0328 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $1,851 $286 Implemented
MA0328 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,432 $3,380 Not Implemented