IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3053 Gaskets, Packing And Sealing Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0944 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $456 $1,404 Not Implemented
GT0944 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $4,110 $3,531 Not Implemented
GT0944 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,478 $20,506 Implemented
GT0944 # 05 Y:2020 05 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,591 $2,000 Implemented
GT0944 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,117 $1,000 Not Implemented
GT0944 # 03 Y:2020 03 2020 UPGRADE CONTROLS ON COMPRESSORS $47,317 $4,200 Implemented
GT0944 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,307 $300 Not Implemented
GT0944 # 01 Y:2020 01 2020 CHECK FOR ACCURACY OF UTILITY / POWER METERS $83,286 $2,000 Implemented
GT0525 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,470 $6,520 Implemented
GT0525 # 06 Y:1994 06 1994 COVER OPEN TANKS $2,280 $740 Not Implemented
GT0525 # 05 Y:1994 05 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $7,600 $2,550 Not Implemented
GT0525 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,170 $32,530 Implemented
GT0525 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,860 $1,150 Implemented
GT0525 # 01 Y:1994 01 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,630 $5,000 Not Implemented
GT0341 # 07 Y:1988 07 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,850 $400 Implemented
GT0341 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $111 $112 Not Implemented
GT0341 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $460 Not Implemented
GT0341 # 04 Y:1988 04 1988 KEEP LAMPS AND REFLECTORS CLEAN $1,730 $3,720 Not Implemented
GT0341 # 03 Y:1988 03 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,170 $760 Not Implemented
GT0341 # 02 Y:1988 02 1988 REDUCE VENTILATION AIR $2,230 $400 Implemented
GT0341 # 01 Y:1988 01 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $550 Implemented
GT0220 # 01 Y:1984 01 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $590 $1,200 Not Implemented
GT0220 # 05 Y:1984 05 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $76 $150 Implemented
GT0220 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $301 $640 Implemented
GT0220 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,170 $3,000 Implemented