IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0121 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,136 $0 Implemented
RU0121 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,316 $267 Implemented
RU0121 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,917 $459 Implemented
RU0121 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $300 $500 Implemented
RU0121 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,648 $0 Implemented
RU0121 # 06 Y:1991 06 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $51,300 $0 Implemented
RU0121 # 07 Y:1991 07 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,329 $900 Implemented
RU0115 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,350 $0 Implemented
RU0115 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,064 $87 Implemented
RU0115 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,353 $800 Implemented
RU0115 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,855 $201 Implemented
RU0115 # 05 Y:1991 05 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,087 $6,840 Implemented
RU0115 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,343 $0 Implemented
RU0115 # 07 Y:1991 07 1991 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,041 $2,700 Implemented
RU0115 # 08 Y:1991 08 1991 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $5,372 $875 Implemented