IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0427 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $672 $800 Implemented
NV0002 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,302 $2,900 Implemented
NV0002 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $3,943 $208 Implemented
NV0002 # 05 Y:1994 05 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $980 $1,300 Implemented
NV0002 # 06 Y:1994 06 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $406 $500 Implemented
NV0002 # 07 Y:1994 07 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,991 $1,000 Implemented
KG0001 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $9,187 $0 Implemented
OR0205 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $897 $2,000 Implemented
OR0205 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,085 $3,659 Implemented
OR0205 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,724 $6,475 Implemented
OR0205 # 06 Y:1994 06 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $845 $0 Implemented
OR0205 # 07 Y:1994 07 1994 REDUCE SCRAP PRODUCTION $7,200 $16,420 Implemented
SF0025 # 01 Y:1994 01 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $80,193 $254,208 Implemented
SF0025 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $2,100 Implemented
IA0081 # 01 Y:1994 01 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,823 $7,982 Implemented
IA0081 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,535 $6,200 Implemented
IA0081 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,455 $2,215 Implemented
IA0081 # 06 Y:1994 06 1994 DISCONNECT BALLASTS $201 $494 Implemented
IA0081 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $311 $25 Implemented
IA0081 # 08 Y:1994 08 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $294 $786 Implemented
HO0068 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,273 $1,817 Implemented
HO0068 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $786 $1,283 Implemented
HO0068 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $174 $600 Implemented
NC0021 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,164 $0 Implemented
NC0021 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,827 $390 Implemented