IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0047 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,568 $2,000 Not Implemented
HO0045 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,410 $2,252 Implemented
HO0045 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,086 $1,095 Not Implemented
HO0045 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $743 $1,067 Not Implemented
HO0045 # 04 Y:1993 04 1993 MOVE BOILER TO MORE EFFICIENT LOCATION $665 $1,997 Not Implemented
RU0121 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,136 $0 Implemented
RU0121 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,316 $267 Implemented
RU0121 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,917 $459 Implemented
RU0121 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $300 $500 Implemented
RU0121 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,648 $0 Implemented
RU0121 # 06 Y:1991 06 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $51,300 $0 Implemented
RU0121 # 07 Y:1991 07 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,329 $900 Implemented
RU0115 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,350 $0 Implemented
RU0115 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,064 $87 Implemented
RU0115 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,353 $800 Implemented
RU0115 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,855 $201 Implemented
RU0115 # 05 Y:1991 05 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,087 $6,840 Implemented
RU0115 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,343 $0 Implemented
RU0115 # 07 Y:1991 07 1991 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,041 $2,700 Implemented
RU0115 # 08 Y:1991 08 1991 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $5,372 $875 Implemented
RU0112 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,746 $368 Not Implemented
RU0112 # 02 Y:1991 02 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,909 $0 Not Implemented
RU0112 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $10,102 $800 Not Implemented
RU0112 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,299 $839 Not Implemented
RU0112 # 05 Y:1991 05 1991 REPAIR AND ELIMINATE STEAM LEAKS $1,725 $430 Not Implemented