IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

298

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0155 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,269 $2,500 Not Implemented
LE0155 # 01 Y:2003 01 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $947 $0 Implemented
HO0225 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,277 $800 Not Implemented
HO0225 # 04 Y:2000 04 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,147 $7,000 Not Implemented
HO0225 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $1,969 Implemented
HO0225 # 02 Y:2000 02 2000 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $140,732 $210,000 Not Implemented
HO0225 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,058 $800 Not Implemented
HO0225 # 14 Y:2000 14 2000 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $9,938 $100 Not Implemented
HO0225 # 13 Y:2000 13 2000 IMPROVE HANDLING PRACTICES $2,100 $500 Not Implemented
HO0225 # 12 Y:2000 12 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,200 $0 Not Implemented
HO0225 # 10 Y:2000 10 2000 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $19,410 $20,000 Not Implemented
HO0225 # 09 Y:2000 09 2000 OPTIMIZE PLANT POWER FACTOR $5,459 $6,386 Not Implemented
HO0225 # 08 Y:2000 08 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,294 $80 Not Implemented
HO0225 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,603 $15 Not Implemented
HO0225 # 06 Y:2000 06 2000 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,819 $1,860 Not Implemented
HO0225 # 11 Y:2000 11 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $256 $500 Not Implemented
HO0217 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,121 $6,030 n/a
HO0217 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $725 $200 n/a
HO0217 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,922 $15,200 n/a
HO0217 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $8,538 $1,008 n/a
HO0217 # 05 Y:2000 05 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $60,015 $400,000 n/a
HO0217 # 07 Y:2000 07 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $540 $100 n/a
HO0217 # 06 Y:2000 06 2000 IMPROVE SPACE COMFORT CONDITIONING $4,365 $500 n/a
HO0209 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $3,541 $1,468 Not Implemented
HO0209 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $570 Implemented