Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
13,317
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0177 # 01 Y:1993 | 01 | 1993 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $8,536 | $4,000 | Implemented |
OR0177 # 02 Y:1993 | 02 | 1993 | INSULATE BARE EQUIPMENT | $3,577 | $5,499 | Implemented |
OR0177 # 03 Y:1993 | 03 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $531 | $2,480 | Not Implemented |
OR0177 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,705 | $8,511 | Not Implemented |
OR0177 # 05 Y:1993 | 05 | 1993 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,494 | $0 | Not Implemented |
OR0177 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $793 | $1,263 | Not Implemented |
WI0181 # 01 Y:1993 | 01 | 1993 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $16,753 | $56,100 | n/a |
WI0181 # 02 Y:1993 | 02 | 1993 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,475 | $8,970 | n/a |
WI0181 # 03 Y:1993 | 03 | 1993 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,109 | $10,500 | n/a |
WI0181 # 04 Y:1993 | 04 | 1993 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,410 | $10,000 | n/a |
WI0181 # 05 Y:1993 | 05 | 1993 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,292 | $0 | n/a |
WI0181 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,345 | $7,884 | n/a |
WI0181 # 07 Y:1993 | 07 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,468 | $7,899 | n/a |
WI0181 # 08 Y:1993 | 08 | 1993 | INSTALL OCCUPANCY SENSORS | $1,462 | $1,425 | n/a |
WI0181 # 09 Y:1993 | 09 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,196 | $1,600 | n/a |
WI0181 # 10 Y:1993 | 10 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,175 | $2,000 | n/a |
WI0181 # 11 Y:1993 | 11 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $996 | $0 | n/a |
WI0181 # 12 Y:1993 | 12 | 1993 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $897 | $897 | n/a |
WI0181 # 13 Y:1993 | 13 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $350 | $350 | n/a |
SF0003 # 01 Y:1993 | 01 | 1993 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $655 | $192 | Implemented |
SF0003 # 02 Y:1993 | 02 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,485 | $900 | Implemented |
SF0003 # 03 Y:1993 | 03 | 1993 | USE OPTIMUM THICKNESS INSULATION | $3,546 | $4,231 | Implemented |
SF0003 # 04 Y:1993 | 04 | 1993 | INSULATE BARE EQUIPMENT | $453 | $557 | Not Implemented |
SF0003 # 05 Y:1993 | 05 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,118 | $3,875 | Implemented |
SF0003 # 06 Y:1993 | 06 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,294 | $14,000 | Implemented |