IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,307

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0372 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $305 $6,008 Implemented
UD0368 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $9,369 $6,350 Implemented
UD0368 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,944 $0 Not Implemented
UD0368 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,778 $0 Not Implemented
UD0368 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,359 $2,772 Implemented
UD0361 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $4,347 $6,000 Implemented
UD0361 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,671 $2,800 Not Implemented
UD0361 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,024 $100 Not Implemented
UD0361 # 04 Y:1992 04 1992 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $4,283 $7,500 Not Implemented
UD0361 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $639 $2,500 Implemented
UD0350 # 01 Y:1991 01 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $22,101 $0 Implemented
UD0350 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $4,130 $0 Implemented
UD0338 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,351 $0 Not Implemented
UD0338 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,344 $0 Not Implemented
UD0338 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,748 $0 Not Implemented
UD0334 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,567 $0 Implemented
UD0334 # 02 Y:1991 02 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,627 $4,000 Implemented
UD0334 # 03 Y:1991 03 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $5,208 $0 Implemented
UD0329 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $17,856 $20,000 Implemented
UD0329 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $5,309 $1,000 Implemented
UD0329 # 03 Y:1990 03 1990 BURN WASTE OIL FOR HEAT $6,067 $0 Implemented
UD0329 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,783 $7,500 Implemented
UD0329 # 05 Y:1990 05 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,223 $6,240 Implemented
UD0319 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,147 $0 Implemented
UD0319 # 02 Y:1990 02 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,320 $0 Implemented