Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,307
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0372 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $305 | $6,008 | Implemented |
UD0368 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $9,369 | $6,350 | Implemented |
UD0368 # 02 Y:1992 | 02 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,944 | $0 | Not Implemented |
UD0368 # 03 Y:1992 | 03 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,778 | $0 | Not Implemented |
UD0368 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,359 | $2,772 | Implemented |
UD0361 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $4,347 | $6,000 | Implemented |
UD0361 # 02 Y:1992 | 02 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,671 | $2,800 | Not Implemented |
UD0361 # 03 Y:1992 | 03 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,024 | $100 | Not Implemented |
UD0361 # 04 Y:1992 | 04 | 1992 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $4,283 | $7,500 | Not Implemented |
UD0361 # 05 Y:1992 | 05 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $639 | $2,500 | Implemented |
UD0350 # 01 Y:1991 | 01 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $22,101 | $0 | Implemented |
UD0350 # 02 Y:1991 | 02 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,130 | $0 | Implemented |
UD0338 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,351 | $0 | Not Implemented |
UD0338 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,344 | $0 | Not Implemented |
UD0338 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $1,748 | $0 | Not Implemented |
UD0334 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,567 | $0 | Implemented |
UD0334 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,627 | $4,000 | Implemented |
UD0334 # 03 Y:1991 | 03 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $5,208 | $0 | Implemented |
UD0329 # 01 Y:1990 | 01 | 1990 | OPTIMIZE PLANT POWER FACTOR | $17,856 | $20,000 | Implemented |
UD0329 # 02 Y:1990 | 02 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,309 | $1,000 | Implemented |
UD0329 # 03 Y:1990 | 03 | 1990 | BURN WASTE OIL FOR HEAT | $6,067 | $0 | Implemented |
UD0329 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,783 | $7,500 | Implemented |
UD0329 # 05 Y:1990 | 05 | 1990 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,223 | $6,240 | Implemented |
UD0319 # 01 Y:1990 | 01 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,147 | $0 | Implemented |
UD0319 # 02 Y:1990 | 02 | 1990 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,320 | $0 | Implemented |