Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
201
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0445 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,693 | $40,964 | Implemented |
WV0445 # 06 Y:2012 | 06 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,421 | $415 | Implemented |
WV0445 # 07 Y:2012 | 07 | 2012 | STANDARDIZE MOTOR INVENTORY | $8,227 | $920 | Not Implemented |
WV0445 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,321 | $8,880 | Not Implemented |
WV0445 # 09 Y:2012 | 09 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,036 | $4,975 | Not Implemented |
WV0445 # 10 Y:2012 | 10 | 2012 | INSULATE BARE EQUIPMENT | $3,234 | $4,181 | Implemented |
WV0445 # 11 Y:2012 | 11 | 2012 | IMPROVE LUBRICATION PRACTICES | $2,929 | $2,741 | Not Implemented |
WV0445 # 12 Y:2012 | 12 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,961 | $105 | Implemented |
WV0445 # 13 Y:2012 | 13 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,693 | $2,745 | Not Implemented |
WV0445 # 14 Y:2012 | 14 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,412 | $543 | Implemented |
WV0445 # 15 Y:2012 | 15 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $188 | $423 | Not Implemented |
WV0445 # 16 Y:2012 | 16 | 2012 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $174 | $555 | Not Implemented |
WV0358 # 01 Y:2007 | 01 | 2007 | IMPROVE COMBUSTION CONTROL CAPABILITY | $91,739 | $34,400 | Not Implemented |
WV0358 # 02 Y:2007 | 02 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $27,409 | $34,100 | Not Implemented |
WV0358 # 03 Y:2007 | 03 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $20,287 | $6,050 | Implemented |
WV0358 # 04 Y:2007 | 04 | 2007 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $24,675 | $15,300 | Implemented |
WV0358 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,775 | $8,600 | Implemented |
WV0358 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,908 | $5,830 | Not Implemented |
WV0358 # 07 Y:2007 | 07 | 2007 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,651 | $1,000 | Implemented |
WV0358 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,029 | $0 | Implemented |
WV0358 # 09 Y:2007 | 09 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $1,016 | $555 | Implemented |
WV0358 # 10 Y:2007 | 10 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $998 | $1,555 | Implemented |
WV0358 # 11 Y:2007 | 11 | 2007 | INSTALL OCCUPANCY SENSORS | $679 | $2,103 | Implemented |
WV0358 # 12 Y:2007 | 12 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $468 | $78 | Implemented |
WV0358 # 13 Y:2007 | 13 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $432 | $119 | Not Implemented |