IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

302

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0181 # 03 Y:1993 03 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,109 $10,500 n/a
WI0181 # 04 Y:1993 04 1993 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,410 $10,000 n/a
WI0181 # 05 Y:1993 05 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,292 $0 n/a
WI0181 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,345 $7,884 n/a
WI0181 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,468 $7,899 n/a
WI0181 # 08 Y:1993 08 1993 INSTALL OCCUPANCY SENSORS $1,462 $1,425 n/a
WI0181 # 09 Y:1993 09 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,196 $1,600 n/a
WI0181 # 10 Y:1993 10 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,175 $2,000 n/a
WI0181 # 11 Y:1993 11 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $996 $0 n/a
WI0181 # 12 Y:1993 12 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $897 $897 n/a
WI0181 # 13 Y:1993 13 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $350 $350 n/a
SF0003 # 01 Y:1993 01 1993 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $655 $192 Implemented
SF0003 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,485 $900 Implemented
SF0003 # 03 Y:1993 03 1993 USE OPTIMUM THICKNESS INSULATION $3,546 $4,231 Implemented
SF0003 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $453 $557 Not Implemented
SF0003 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,118 $3,875 Implemented
SF0003 # 06 Y:1993 06 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,294 $14,000 Implemented
MA0272 # 01 Y:1993 01 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,014 $49 Implemented
MA0272 # 02 Y:1993 02 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,741 $68 Implemented
MA0272 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,507 $12,663 Implemented
MA0272 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,797 $0 Implemented
MA0272 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,077 $5,694 Not Implemented
MA0272 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $726 $400 Not Implemented
MA0272 # 07 Y:1993 07 1993 INSULATE BARE EQUIPMENT $6,765 $167 Implemented
MA0272 # 08 Y:1993 08 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $31 $67 Not Implemented