IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

884

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0265 # 05 Y:2004 05 2004 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $6,581 $10,000 n/a
UM0265 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,069 $975 Not Implemented
UM0265 # 07 Y:2004 07 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,652 $250 Not Implemented
UM0265 # 08 Y:2004 08 2004 COVER OPEN TANKS $855 $1,500 Not Implemented
MA0543 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,705 $21,900 n/a
MA0543 # 02 Y:2003 02 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $26,717 $40,000 Not Implemented
MA0543 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,265 $0 Not Implemented
MA0543 # 04 Y:2003 04 2003 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,292 $0 Not Implemented
MA0543 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,953 $12,400 Not Implemented
MA0543 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,571 $12,104 Implemented
MA0543 # 07 Y:2003 07 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,408 $527 Implemented
GT0748 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $116,954 $2,000 n/a
GT0748 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $44,604 $85,000 n/a
GT0748 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,809 $0 n/a
GT0748 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,314 $2,844 n/a
GT0748 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $17,760 n/a
GT0748 # 06 Y:2003 06 2003 USE OPTIMUM TEMPERATURE $76,382 $16,640 n/a
GT0748 # 07 Y:2003 07 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $22,400 $22,800 n/a
GT0748 # 08 Y:2003 08 2003 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $810,975 $4,250,000 n/a
MS0231 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $89,273 $191,565 Implemented
MS0231 # 02 Y:2003 02 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,273 $4,486 Not Implemented
MS0231 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $13,851 $7,500 Not Implemented
MS0231 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,508 $26,644 Not Implemented
MS0231 # 05 Y:2003 05 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,811 $11,139 Not Implemented
MS0231 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,964 $3,200 Not Implemented