IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0720 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $930 $1,330 Not Implemented
CO0720 # 04 Y:2016 04 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,510 $27,600 Not Implemented
CO0720 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,190 $67,155 Implemented
CO0720 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,840 $300 Implemented
CO0720 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,640 $62,670 Not Implemented
CO0588 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,244 $493 Implemented
CO0588 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $130 $390 Not Implemented
CO0588 # 08 Y:2006 08 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,300 $2,950 Not Implemented
CO0588 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $2,970 Implemented
CO0588 # 06 Y:2006 06 2006 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,680 $1,310 Implemented
CO0588 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,290 $57,670 Implemented
CO0588 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $200 $510 Implemented
CO0588 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,500 $50 Implemented
CO0588 # 01 Y:2006 01 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,610 $9,470 Implemented
CO0053 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $1,025 $1,200 Implemented
CO0053 # 10 Y:1986 10 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,306 $842 Implemented
CO0053 # 09 Y:1986 09 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,286 $50,000 Implemented
CO0053 # 08 Y:1986 08 1986 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,332 $4,000 Not Implemented
CO0053 # 07 Y:1986 07 1986 IMPROVE LUBRICATION PRACTICES $1,616 $0 Implemented
CO0053 # 06 Y:1986 06 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,436 $1,100 Not Implemented
CO0053 # 05 Y:1986 05 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,464 $4,000 Not Implemented
CO0053 # 04 Y:1986 04 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,947 $3,700 Not Implemented
CO0053 # 03 Y:1986 03 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,522 $280 Implemented
CO0053 # 02 Y:1986 02 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $673 $1,100 Not Implemented