IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

941

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0591 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,916 $5,984 n/a
LE0591 # 07 Y:2025 07 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,746 $62,882 n/a
LE0591 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $298 n/a
LE0591 # 02 Y:2025 02 2025 INSTALL OCCUPANCY SENSORS $482 $140 n/a
LE0591 # 03 Y:2025 03 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,438 $3,216 n/a
LE0591 # 01 Y:2025 01 2025 INSTALL TIMERS AND/OR THERMOSTATS $27,684 $0 n/a
LE0591 # 04 Y:2025 04 2025 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,399 $4,500 n/a
MS0439 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $2,676 $7,542 n/a
MS0439 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,650 $0 n/a
MS0439 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $121,416 $769,370 n/a
MS0439 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $1,314 $1,810 n/a
MS0439 # 05 Y:2024 05 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $586 $8,100 n/a
UC2409 # 09 Y:2024 09 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,316 $22,456 n/a
UC2409 # 10 Y:2024 10 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $97,545 $403,849 n/a
UC2409 # 08 Y:2024 08 2024 REPLACE BOILER $28,994 $154,002 n/a
UC2409 # 06 Y:2024 06 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $957 $6,632 n/a
UC2409 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,347 $15,260 n/a
UC2409 # 02 Y:2024 02 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,580 $0 n/a
UC2409 # 01 Y:2024 01 2024 PAY UTILITY BILLS ON TIME $517 $0 n/a
UC2409 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,298 $1,300 n/a
UC2409 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $813 $75 n/a
UC2409 # 03 Y:2024 03 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $264 $0 n/a
UW2410 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,418 $25,000 Implemented
UW2410 # 01 Y:2024 01 2024 INSTALL EQUIPMENT TO MOVE PRODUCT $855,879 $575,120 Implemented
UW2410 # 03 Y:2024 03 2024 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $131,806 $610,500 Implemented