Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 3088 | Plastics Plumbing Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0130 # 02 Y:2006 | 02 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,958 | $202 | Implemented |
MI0130 # 03 Y:2006 | 03 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,791 | $1,020 | Implemented |
MI0130 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,865 | $1,074 | Implemented |
MI0130 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,043 | $720 | Not Implemented |
MI0130 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,895 | $3,800 | Implemented |
MI0130 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,650 | $30 | Not Implemented |
MI0130 # 01 Y:2006 | 01 | 2006 | REDESIGN PROCESS | $7,148 | $580 | Implemented |
UF0228 # 06 Y:1999 | 06 | 1999 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $57,600 | $1,090,000 | Implemented |
UF0228 # 05 Y:1999 | 05 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $274,473 | $22,390 | Not Implemented |
UF0228 # 04 Y:1999 | 04 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,660 | $955 | Not Implemented |
UF0228 # 03 Y:1999 | 03 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $9,888 | $50 | Implemented |
UF0228 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,958 | $0 | Not Implemented |
UF0228 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,851 | $0 | Not Implemented |
UF0050 # 07 Y:1993 | 07 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $528 | $300 | Implemented |
UF0050 # 08 Y:1993 | 08 | 1993 | UPGRADE CONTROLS ON COMPRESSORS | $2,837 | $1,500 | Not Implemented |
UF0050 # 09 Y:1993 | 09 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,657 | $550 | Implemented |
UF0050 # 06 Y:1993 | 06 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,792 | $4,698 | Implemented |
UF0050 # 05 Y:1993 | 05 | 1993 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $540 | $300 | Implemented |
UF0050 # 04 Y:1993 | 04 | 1993 | INSTALL SKYLIGHTS | $3,172 | $2,175 | Not Implemented |
UF0050 # 03 Y:1993 | 03 | 1993 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,451 | $15,435 | Not Implemented |
UF0050 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,217 | $3,011 | Implemented |
UF0050 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,876 | $1,499 | Implemented |