Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,878
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0180 # 01 Y:1990 | 01 | 1990 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,523 | $5,750 | Implemented |
MA0180 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,604 | $334 | Implemented |
UD0319 # 01 Y:1990 | 01 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,147 | $0 | Implemented |
UD0319 # 02 Y:1990 | 02 | 1990 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,320 | $0 | Implemented |
UD0319 # 03 Y:1990 | 03 | 1990 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $13,053 | $0 | Implemented |
UD0319 # 04 Y:1990 | 04 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,790 | $0 | Implemented |
MA0177 # 03 Y:1990 | 03 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $822 | $120 | Implemented |
MA0177 # 04 Y:1990 | 04 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,411 | $8,500 | Implemented |
OR0084 # 03 Y:1990 | 03 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,603 | $2,563 | Implemented |
OR0084 # 04 Y:1990 | 04 | 1990 | INSULATE BARE EQUIPMENT | $1,837 | $3,500 | Implemented |
OR0084 # 05 Y:1990 | 05 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,851 | $18,000 | Implemented |
KU0310 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,155 | $4,288 | Implemented |
KU0310 # 02 Y:1990 | 02 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,513 | $280 | Implemented |
KU0310 # 05 Y:1990 | 05 | 1990 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,069 | $1,000 | Implemented |
KU0310 # 06 Y:1990 | 06 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $496 | $0 | Implemented |
MA0176 # 01 Y:1990 | 01 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $444 | $1,000 | Implemented |
MA0176 # 02 Y:1990 | 02 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,404 | $2,000 | Implemented |
MA0176 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $799 | $101 | Implemented |
MA0176 # 06 Y:1990 | 06 | 1990 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $1,909 | $2,000 | Implemented |
MA0176 # 07 Y:1990 | 07 | 1990 | INSTALL SET-BACK TIMERS | $106 | $200 | Implemented |
KU0307 # 04 Y:1990 | 04 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $140 | $0 | Implemented |
KU0307 # 05 Y:1990 | 05 | 1990 | USE MINIMUM SAFE OVEN VENTILATION | $4,979 | $600 | Implemented |
KU0307 # 06 Y:1990 | 06 | 1990 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $250 | $0 | Implemented |
KU0307 # 07 Y:1990 | 07 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $13,730 | $14,000 | Implemented |
KU0307 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,882 | $1,861 | Implemented |