IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

307

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0071 # 04 Y:1992 04 1992 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $149 $354 Not Implemented
MO0071 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $950 $10,000 Implemented
KU0368 # 01 Y:1992 01 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,112 $21,000 Not Implemented
KU0368 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $5,425 $6,112 Not Implemented
KU0368 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $5,403 $5,376 Not Implemented
KU0368 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,931 $0 Implemented
KU0368 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $707 $0 Implemented
MO0008 # 01 Y:1990 01 1990 PAY UTILITY BILLS ON TIME $2,180 $0 Implemented
MO0008 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,876 $420 Not Implemented
MO0008 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,322 $1,990 Not Implemented
MO0008 # 04 Y:1990 04 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,214 $1,844 Not Implemented
MO0008 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $735 $319 Implemented
MO0008 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $171 $0 Not Implemented
KU0310 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,155 $4,288 Implemented
KU0310 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,513 $280 Implemented
KU0310 # 03 Y:1990 03 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,188 $18,000 Not Implemented
KU0310 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $734 $0 Not Implemented
KU0310 # 05 Y:1990 05 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,069 $1,000 Implemented
KU0310 # 06 Y:1990 06 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $496 $0 Implemented
KU0310 # 07 Y:1990 07 1990 COMBINE UTILITY METERS $230 $150 Not Implemented
KU0307 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,882 $1,861 Implemented
KU0307 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $503 $0 Implemented
KU0307 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $235 $50 Not Implemented
KU0307 # 04 Y:1990 04 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $140 $0 Implemented
KU0307 # 05 Y:1990 05 1990 USE MINIMUM SAFE OVEN VENTILATION $4,979 $600 Implemented