IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0176 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $8,741 $988 Implemented
MI0176 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $35,760 $860 Implemented
MI0176 # 02 Y:2009 02 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,854 $30,000 Not Implemented
MI0176 # 03 Y:2009 03 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $25,058 $4,531 Implemented
MI0176 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,607 $40 Implemented
MI0176 # 06 Y:2009 06 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,995 $480 Implemented
MI0176 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,251 $1,210 Implemented
MI0176 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,586 $1,672 Implemented
MI0176 # 09 Y:2009 09 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,657 $1,320 Implemented
MI0159 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,266 $3,978 Implemented
MI0159 # 01 Y:2008 01 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,617 $120 Implemented
MI0159 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,137 $1,210 Implemented
MI0159 # 03 Y:2008 03 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,615 $3,475 Implemented
MI0159 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,337 $40 Implemented
MI0159 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,238 $280 Implemented
MI0159 # 07 Y:2008 07 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,875 $120 Not Implemented
MI0159 # 08 Y:2008 08 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,521 $480 Implemented
MI0151 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $46,436 $1,955 Not Implemented
MI0151 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,331 $30 Not Implemented
MI0151 # 05 Y:2007 05 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,528 $3,010 Not Implemented
MI0151 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,109 $1,074 Implemented
MI0151 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,594 $20,498 Implemented
MI0151 # 02 Y:2007 02 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $67,528 $120 Implemented