IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,727

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0212 # 04 Y:1991 04 1991 DISCONNECT BALLASTS $1,580 $1,875 Implemented
MA0212 # 05 Y:1991 05 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,665 $5,000 Implemented
MA0212 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $393 $161 Implemented
MA0212 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,146 $79,350 Implemented
MA0212 # 09 Y:1991 09 1991 OPTIMIZE PLANT POWER FACTOR $6,858 $0 Implemented
CO0214 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,100 $5,700 Not Implemented
CO0214 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $769 $280 Not Implemented
CO0214 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $479 $200 Not Implemented
CO0214 # 04 Y:1991 04 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $922 $2,575 Not Implemented
CO0214 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,050 $25,000 Not Implemented
CO0214 # 06 Y:1991 06 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $950 $6,500 Not Implemented
UD0338 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,351 $0 Not Implemented
UD0338 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,344 $0 Not Implemented
UD0338 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,748 $0 Not Implemented
MA0204 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,629 $0 Not Implemented
MA0204 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $12,296 $3,400 Not Implemented
MA0204 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,632 $46,085 Not Implemented
MA0204 # 04 Y:1991 04 1991 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,064 $11,160 Not Implemented
MA0204 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,027 $31,600 Not Implemented
MA0204 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $48 Not Implemented
OR0099 # 01 Y:1990 01 1990 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $669 $50 Implemented
OR0099 # 02 Y:1990 02 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $511 $60 Implemented
OR0099 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $53 $117 Not Implemented
OR0099 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $399 $1,480 Not Implemented
OR0099 # 05 Y:1990 05 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,167 $20,751 Not Implemented