IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,524

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0066 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $200 Implemented
MA0066 # 03 Y:1986 03 1986 INSTALL STORM WINDOWS AND DOORS $474 $1,000 Implemented
MA0066 # 04 Y:1986 04 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,424 $0 Implemented
UD0205 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,692 $708 Implemented
UD0205 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,886 $5,000 Implemented
UD0205 # 03 Y:1986 03 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,480 $52,200 Implemented
UD0205 # 04 Y:1986 04 1986 INSTALL STORM WINDOWS AND DOORS $6,617 $6,040 Not Implemented
UD0205 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,237 $12,000 Implemented
UD0205 # 06 Y:1986 06 1986 RECOVER WASTE HEAT FROM EQUIPMENT $5,622 $11,000 Implemented
AT0040 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,491 $971 Not Implemented
AT0040 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $399 $200 Not Implemented
AT0040 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,093 $57 Implemented
AT0040 # 04 Y:1986 04 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,638 $30,000 Not Implemented
MA0058 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $90 Implemented
MA0058 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $3,740 $5,760 Implemented
MA0058 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
UD0192 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,234 $2,500 Implemented
UD0192 # 02 Y:1986 02 1986 REDUCE VENTILATION AIR $4,173 $2,500 Implemented
CO0051 # 01 Y:1986 01 1986 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,958 $500 Not Implemented
CO0051 # 02 Y:1986 02 1986 AIR CONDITION ONLY SPACE NECESSARY $809 $500 Not Implemented
CO0051 # 03 Y:1986 03 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,508 $177 Not Implemented
CO0051 # 04 Y:1986 04 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,552 $190 Not Implemented
CO0051 # 05 Y:1986 05 1986 IMPROVE LUBRICATION PRACTICES $1,043 $0 Not Implemented
CO0051 # 06 Y:1986 06 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $578 $200 Not Implemented
CO0051 # 07 Y:1986 07 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $189 $280 Not Implemented