IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

990

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0316 # 03 Y:1990 03 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,175 $0 Not Implemented
UD0316 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,611 $0 Not Implemented
UD0316 # 05 Y:1990 05 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,186 $10,000 Not Implemented
UD0282 # 01 Y:1989 01 1989 OPTIMIZE PLANT POWER FACTOR $9,760 $10,000 Not Implemented
UD0282 # 02 Y:1989 02 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,009 $500 Not Implemented
UD0282 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,389 $0 Not Implemented
UD0282 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $950 $1,500 Not Implemented
UD0282 # 05 Y:1989 05 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,435 $1,500 Not Implemented
UD0282 # 06 Y:1989 06 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,355 $1,350 Not Implemented
UD0249 # 01 Y:1988 01 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $743 $1,200 Implemented
UD0249 # 02 Y:1988 02 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,052 $2,200 Implemented
UD0249 # 03 Y:1988 03 1988 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $712 $550 Implemented
UD0249 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $534 $3,054 Implemented
UD0237 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,394 $200 Implemented
UD0237 # 02 Y:1987 02 1987 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,466 $3,000 Implemented
UD0237 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,505 $1,790 Implemented
UD0237 # 04 Y:1987 04 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $697 $2,000 Implemented
UD0237 # 05 Y:1987 05 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,129 $0 Implemented
UD0237 # 06 Y:1987 06 1987 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,305 $67 Implemented
UD0237 # 07 Y:1987 07 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,948 $4,140 Implemented
UD0237 # 08 Y:1987 08 1987 MINIMIZE WATER USAGE $3,986 $2,000 Implemented
UD0237 # 09 Y:1987 09 1987 RECOVER AND REUSE COOLING WATER $2,400 $4,000 Implemented
UD0231 # 01 Y:1987 01 1987 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $644 $3,000 Not Implemented
UD0231 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,469 $1,070 Implemented
UD0231 # 03 Y:1987 03 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,586 $0 Implemented