IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0440 # 03 Y:2017 03 2017 USE GRAVITY FEEDS WHEREVER POSSIBLE $8,594 $13,600 Not Implemented
AS0440 # 04 Y:2017 04 2017 REDUCE FLUID FLOW RATES $892 $920 Not Implemented
AS0440 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,136 $100 Not Implemented
UM0488 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,972 $3,000 n/a
UM0488 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,383 $300 n/a
UM0488 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $931 $1,500 n/a
UM0488 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,992 $8,978 n/a
UM0488 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $1,958 $2,400 n/a
WV0545 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $7,127 $2,800 Implemented
WV0545 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,951 $490 Implemented
WV0545 # 03 Y:2017 03 2017 INSTALL SET-BACK TIMERS $4,904 $1,700 Implemented
WV0545 # 04 Y:2017 04 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,998 $1,000 Not Implemented
WV0545 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,500 $4,023 Implemented
WV0545 # 06 Y:2017 06 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,459 $1,400 Not Implemented
WV0545 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $943 $500 Not Implemented
WV0545 # 08 Y:2017 08 2017 DEVELOP A REPAIR/REPLACE POLICY $516 $568 Implemented
WV0545 # 09 Y:2017 09 2017 INSULATE BARE EQUIPMENT $468 $156 Not Implemented
WV0545 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $268 $20 Implemented
WV0545 # 11 Y:2017 11 2017 MINIMIZE WATER USAGE $65 $300 Not Implemented
WV0545 # 12 Y:2017 12 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $60 $128 Not Implemented
SU0440 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $340 $146 Implemented
SU0440 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,272 $1,167 Implemented
SU0440 # 03 Y:2017 03 2017 ELIMINATE/REDUCE AN OPERATION $9,234 $6,378 Not Implemented
SU0440 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $175 Implemented
SU0440 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $1,739 Implemented