Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 31 | Leather And Leather Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0117 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,880 | $0 | Not Implemented |
IC0117 # 01 Y:2006 | 01 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $103,343 | $192,802 | Not Implemented |
IC0117 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,391 | $8,404 | Not Implemented |
IC0117 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,256 | $8,992 | Not Implemented |
IC0117 # 08 Y:2006 | 08 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,574 | $88,643 | Not Implemented |
IC0117 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,442 | $3,500 | Not Implemented |
IC0117 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,809 | $34,020 | Not Implemented |
IC0117 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,057 | $0 | Not Implemented |
IC0117 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,086 | $2,100 | Not Implemented |
IC0117 # 03 Y:2006 | 03 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $5,541 | $1,690 | Not Implemented |
IC0018 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $258 | $2,054 | n/a |
IC0018 # 02 Y:2001 | 02 | 2001 | INSTALL SET-BACK TIMERS | $11,384 | $2,500 | n/a |
IC0018 # 03 Y:2001 | 03 | 2001 | AUTOMATE PAYROLL SYSTEM | $16,500 | $8,600 | n/a |
WI0321 # 01 Y:1998 | 01 | 1998 | CLEAR AND RENT EXISTING SPACE | $159,400 | $5,292 | Implemented |
WI0321 # 08 Y:1998 | 08 | 1998 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $588 | $0 | Not Implemented |
WI0321 # 07 Y:1998 | 07 | 1998 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $680 | $2,100 | Not Implemented |
WI0321 # 06 Y:1998 | 06 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $860 | $500 | Implemented |
WI0321 # 05 Y:1998 | 05 | 1998 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,197 | $200 | Not Implemented |
WI0321 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,118 | $15,500 | Not Implemented |
WI0321 # 03 Y:1998 | 03 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,313 | $0 | Not Implemented |
WI0321 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,855 | $23,584 | Not Implemented |
WI0077 # 01 Y:1990 | 01 | 1990 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $10,331 | $5,700 | Not Implemented |
WI0077 # 02 Y:1990 | 02 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $3,542 | $250 | Implemented |
WI0077 # 03 Y:1990 | 03 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,062 | $5,000 | Implemented |
WI0077 # 04 Y:1990 | 04 | 1990 | INSTALL STORM WINDOWS AND DOORS | $1,202 | $765 | Implemented |